Renovation Blog
This is our estimate and actual costs of the renovation to date. I intend to do as much work as possible myself which will keep
some of the costs down.
| Item |
Projected |
Actual |
| Roof |
£50,000 |
£36,000 |
| Pointing |
£10,000 |
£6,500 |
| Building work |
£20,000 |
£5,000 so far |
| Woodchip boiler |
£10,000 |
£14,000 |
| Plumbing/heating |
£14,000 |
£25,000 |
| Electrics |
£1,000 |
£1,000 so far |
| Kitchen and bathrooms |
£35,000 |
£8,000 so far |
| Lighting |
£2,000 |
|
| Decoration |
£8,000 |
|
| Contingency |
£15,000 |
|
|
|
|
| TOTAL |
£165,000 |
£95,500 so far |
Notes to date
- Roofing came in a bit lower as we could save VAT on some of the work, and managed to re-use a lot of our existing slate
- Pointing was reduced as I did a lot of it myself rather than pay someone else to do the work
- We had underestimated how much plumbing first fix work would be needed, and also decided to buy a rainwater harvesting tank
for flushing the toilets and the washing machine
Back to Renovation Blog
Finding and buying the house
May 2008
April 2008
March 2008
February 2008
January 2008
December 2007
November 2007
October 2007
September 2007
August 2007
July 2007
June 2007
May 2007
April 2007
March 2007
February 2007
January 2007
December 2006
November 2006
October 2006
September 2006
August 2006
|